LV & MV Switchboards · Busducts · Automation · Energy Management
Email: mails@elinsswitchboards.com | Phone: +91 80 6187 9000 (Weekdays - 10 a.m. to 6 p.m.) | Download brochure ↓
PLC and automation testing
Structured PLC and panel testing confirms I/O, sequences, interlocks, alarms, communications and operator interfaces before dispatch.
In short
Structured PLC and panel testing confirms I/O, sequences, interlocks, alarms, communications and operator interfaces before dispatch.
Power-up and hardware verification
Digital and analogue I/O checks
Sequence and interlock simulation
Alarm and event verification
HMI and mimic checks
Communication-interface testing
Where required, test scripts can be agreed with the customer and demonstrated during factory acceptance testing.
Approved logic, I/O schedules, cause-and-effect requirements and test records provide the basis for site commissioning.
Let's work together